Preview: the first 3 of 5 questions. This test is part of Vocab24 Prime. The first tests of every section are free.
In the following passage, there are blanks, each of which has been numbered. Find out the appropriate word/phrase in each case.
The Fukushima Daiichi nuclear disaster was an energy (21) at the Fukushima I Nuclear Power Plant in Fukushima, initiated primarily by the tsunami (22) the Tohoku earthquake on 11 March 2011. Immediately after the earthquake, the active reactors automatically shut down their sustained fission reactions. However, the tsunami disabled the emergency generators that would have provided power to control and operate the pumps necessary to cool the reactors. The insufficient cooling led to three nuclear meltdowns, hydrogen-air chemical explosions, and the (23) of radioactive material in Units 1, 2 and 3 from 12 March to 15 March. Loss of cooling also caused the pool for storing spent fuel from Reactor 4 to overheat on 15 March due to the decay heat from the fuel rods. On 5 July 2012, the Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) (24) that the causes of the accident had been foreseeable, and that the plant operator, Tokyo Electric Power Company (TEPCO), had failed to (25) basic safety requirements such as risk assessment, preparing for containing collateral damage, and developing evacuation plans. On 12 October 2012, TEPCO admitted for the first time that it had failed to take necessary measures for fear of inviting lawsuits or protests against its nuclear plants.
In the following passage, there are blanks, each of which has been numbered. Find out the appropriate word/phrase in each case.
The Fukushima Daiichi nuclear disaster was an energy (21) at the Fukushima I Nuclear Power Plant in Fukushima, initiated primarily by the tsunami (22) the Tohoku earthquake on 11 March 2011. Immediately after the earthquake, the active reactors automatically shut down their sustained fission reactions. However, the tsunami disabled the emergency generators that would have provided power to control and operate the pumps necessary to cool the reactors. The insufficient cooling led to three nuclear meltdowns, hydrogen-air chemical explosions, and the (23) of radioactive material in Units 1, 2 and 3 from 12 March to 15 March. Loss of cooling also caused the pool for storing spent fuel from Reactor 4 to overheat on 15 March due to the decay heat from the fuel rods. On 5 July 2012, the Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) (24) that the causes of the accident had been foreseeable, and that the plant operator, Tokyo Electric Power Company (TEPCO), had failed to (25) basic safety requirements such as risk assessment, preparing for containing collateral damage, and developing evacuation plans. On 12 October 2012, TEPCO admitted for the first time that it had failed to take necessary measures for fear of inviting lawsuits or protests against its nuclear plants.
In the following passage, there are blanks, each of which has been numbered. Find out the appropriate word/phrase in each case.
The Fukushima Daiichi nuclear disaster was an energy (21) at the Fukushima I Nuclear Power Plant in Fukushima, initiated primarily by the tsunami (22) the Tohoku earthquake on 11 March 2011. Immediately after the earthquake, the active reactors automatically shut down their sustained fission reactions. However, the tsunami disabled the emergency generators that would have provided power to control and operate the pumps necessary to cool the reactors. The insufficient cooling led to three nuclear meltdowns, hydrogen-air chemical explosions, and the (23) of radioactive material in Units 1, 2 and 3 from 12 March to 15 March. Loss of cooling also caused the pool for storing spent fuel from Reactor 4 to overheat on 15 March due to the decay heat from the fuel rods. On 5 July 2012, the Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) (24) that the causes of the accident had been foreseeable, and that the plant operator, Tokyo Electric Power Company (TEPCO), had failed to (25) basic safety requirements such as risk assessment, preparing for containing collateral damage, and developing evacuation plans. On 12 October 2012, TEPCO admitted for the first time that it had failed to take necessary measures for fear of inviting lawsuits or protests against its nuclear plants.
Prime opens all 1000+ tests, every editorial, every word with tricks and unlimited live speaking, on the website and in the app. From ₹199 a month.
See Prime plans → Already Prime? Log inOne Prime for the website and the app, same login. Videos play in the app.


